Monarto Safari Park Visitor Centre
Project overview
- DateJune, 2021
- ClientMonarto Safari Park
- LocationMonarto Safari Park Visitor Centre,
63 Monarto Rd, Monarto SA 5254 - Websitehttps://www.monartosafari.com.au/
Project requirements
The Monarto Safari Park Visitor Centre is a world-class destination in South Australia, and Access Tanks was thrilled to be involved in this significant project.
Solution
Access Tanks was selected by the designing engineer to manufacture the tank for this project. Our unique ability to custom-build the tank to the engineered, site-specific requirements made us stand out from the crowd.
The treatment system selected by the designing engineer was a 60kL DN2400 Modifiable Volume Tank, designed to meet the site’s unique needs. The “All-in-One” 60kL tank consisted of:
- 40,000L septic tank
- An integrated 20,000L pump chamber

Why the “All-in-One” 60kL Tank?
- Exceptional corrosion-resistant qualities
- Long-life expectancy of 100+ years, providing the client with peace of mind
- Lightweight design (11 tons) for fast and easy installation
- Completed installation in just 30 minutes
- No need for multiple tanks or on-site construction, reducing risks of pipe cracking and leakage
Project implementation
The “All-in-One” 60kL Modifiable Volume Tank installation saved valuable time and money for both the installing contractor and client.
The project’s success stemmed directly from effective communication channels between our exceptional team, the designing engineer, installing contractor, and transport provider.